Case Study: EMR Global OLTC Retrofit vs. Siemens in a South Asian Power Corridor Upgrade
The Corridor That Could Not Wait In 2022, a cross-border power transmission authority managing a high-voltage corridor connecting two South Asian grids initiated a systematic review of its ageing transformer assets. The corridor had been operational for nearly two decades. The transformers, twenty-year-old units rated at 220 kV were carrying significantly higher load than their original design had anticipated, driven by bilateral power trade agreements that had expanded steadily since the early 2010s. The OLTCs inside those transformers were the most immediate concern. They had been specified with Siemens-make tap changers at the time of original commissioning. The units were showing signs of contact degradation. DGA results across several transformers were flagging thermal gas generation. The switching operations already elevated above design frequency due to load growth were producing audible indicators of mechanical wear. The project engineer assigned to the corridor upgrade, ...